{"id":1356,"date":"2012-08-29T17:12:47","date_gmt":"2012-08-29T21:12:47","guid":{"rendered":"https:\/\/www.context.ca\/blog\/?p=1356"},"modified":"2012-08-29T17:12:47","modified_gmt":"2012-08-29T21:12:47","slug":"up-at-the-top-of-market-wharf-construction-update","status":"publish","type":"post","link":"https:\/\/www.context.ca\/blog\/2012\/08\/29\/up-at-the-top-of-market-wharf-construction-update\/","title":{"rendered":"Up At the Top of Market Wharf &#8211; Construction Update"},"content":{"rendered":"<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/Market-Wharf.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf outside \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/Market-Wharf.jpg\" alt=\"Outside of building\" width=\"530\" height=\"795\" \/><\/a><\/p>\n<p>Hello Everyone, we dropped in at Market Wharf to\u00a0 get a quick update in terms of what was going on with the construction. A few updates are below, but first &#8211; a view from the top!<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5398.jpg\"><!--more--><img loading=\"lazy\" decoding=\"async\" title=\"Top of Market Wharf\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5398.jpg\" alt=\"Market Wharf Toronto Skyline\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>We\u2019re currently on track in terms on construction,\u00a0with move-ins scheduled to begin in January.\u00a0Crews are hard at work to make that date a reality.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5428.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"support beam\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5428.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5424.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf penthouse 2\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5424.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5420.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf penthouse floor\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5420.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5425.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf penthouse 3 \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5425.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>Beginnings of the\u00a0Sky Town\u00a0penthouses can be seen on the 33rd and 34th floors.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5441.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf Wiring\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5441.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5434.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"construction stuff \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5434.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5435.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Going Down\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5435.jpg\" alt=\"Market Wharf elevator shaft\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5440.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf Windows\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5440.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>Windows are in\u00a0up to the 28th floor. Balcony railings\u00a0are up to the 15th.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5455.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"pipes\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5455.jpg\" alt=\"market wharf Piping\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5449.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Framing and drywall\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5449.jpg\" alt=\"Framing in Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>Framing and dry-walling are in on the 26th. Tiling can be seen as\u00a0high\u00a0as the 15th\u00a0floor!<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5459.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Tiling \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5459.jpg\" alt=\"Market Wharf tiling\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>The next big thing happening on the site will be the dismantling of the crane, which could take up to 8 hours. Which coincidentally, should make for one interesting update in the near future.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5456.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market Wharf hallway\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5456.jpg\" alt=\"Market wharf hallway construction\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5460.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Table Saw - sawdust pattern\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5460.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>Cabinetry has been installed up until the 14<sup>th<\/sup> floor, countertops are in as well they\u2019re just covered for protection.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5465.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market wharf cabinetry\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5465.jpg\" alt=\"market wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5466.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Granite countertops \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5466.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>Just a peek!<\/p>\n<p>Some leisure spaces have been completed around the 6<sup>th<\/sup> floor \u201cpeanut\u201d, as it has been unofficially christened by the construction crews. Including 2 gorgeous decks to \u201cget away from it all\u201d while still in the city.<\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5467.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market wharf deck\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5467.jpg\" alt=\"Market Wharf\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5473.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"Market wharf peanut \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5473.jpg\" alt=\"Market Wharf peanut\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5476.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"South Deck\" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5476.jpg\" alt=\"Market Wharf south deck\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5477.jpg\"><img loading=\"lazy\" decoding=\"async\" title=\"South deck skyline \" src=\"https:\/\/www.context.ca\/blog\/wordpress-content\/uploads\/2012\/08\/IMG_5477.jpg\" alt=\"market wharf deck skyline south\" width=\"530\" height=\"353\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>That\u2019s it for now, we\u2019ll check back in a few weeks with some updates!<\/p>\n<p>&nbsp;<\/p>\n<p>For more info on Market Wharf &#8211;\u00a0<a title=\"Market Wharf - Site \" href=\"http:\/\/www.marketwharf.com\/\" target=\"_blank\">Visit the site!<\/a><\/p>\n<p>Find out what&#8217;s happening with Context on\u00a0<a title=\"Twitter - HelloContext\" href=\"www.twitter.com\/hellocontext\" target=\"_blank\">Twitter<\/a> and\u00a0<a title=\"HelloContext Pinterest\" href=\"http:\/\/pinterest.com\/hellocontext\/\" target=\"_blank\">Pinterest<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hello Everyone, we dropped in at Market Wharf to\u00a0 get a quick update in terms of what was going on with the construction. A few updates are below, but first &#8211; a view from the top!<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[60,62,76,99,125,126,204,212],"_links":{"self":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/1356"}],"collection":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/comments?post=1356"}],"version-history":[{"count":0,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/1356\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/media?parent=1356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/categories?post=1356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/tags?post=1356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}