{"id":4049,"date":"2017-10-11T11:08:15","date_gmt":"2017-10-11T15:08:15","guid":{"rendered":"https:\/\/www.context.ca\/blog\/?p=4049"},"modified":"2017-10-13T10:22:47","modified_gmt":"2017-10-13T14:22:47","slug":"the-yorkdale-condominiums-construction-update","status":"publish","type":"post","link":"https:\/\/www.context.ca\/blog\/2017\/10\/11\/the-yorkdale-condominiums-construction-update\/","title":{"rendered":"The Yorkdale Condominiums &#8211; Construction Update"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4052\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/3-768x1024.jpg\" alt=\"3\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/3-768x1024.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/3-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Construction on phase 1 at The Yorkdale Condominiums continues to progress as the 11th floor is currently being poured.\u00a0 Roof topping is estimated for later in November with the commencement of window installation by the end of the year.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4050\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/1-1024x768.jpg\" alt=\"1\" width=\"1000\" height=\"750\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/1-1024x768.jpg 1024w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/1-300x225.jpg 300w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/1-768x576.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4051\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/2-768x1024.jpg\" alt=\"2\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/2-768x1024.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/2-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Above is a view looking east from Flemington Road.\u00a0 At the base are the two storey suites.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4054\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/4-1-768x1024.jpg\" alt=\"4\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/4-1-768x1024.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/4-1-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>The retail spaces underneath a large structural concrete canopy along Ranee Avenue can be seen above.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4055\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/5-768x1024.jpg\" alt=\"5\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/5-768x1024.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/5-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4056\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/6-1024x791.jpg\" alt=\"6\" width=\"1000\" height=\"772\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/6-1024x791.jpg 1024w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/6-300x232.jpg 300w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2017\/10\/6-768x593.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>Above is a view looking south west across the Allen Expressway.\u00a0 Phase 1 is nearing its full height in the back ground with Phase 2 now hoarded off in the foreground as shoring and excavation have commenced.<\/p>\n<p>Stay tuned for more updates in the near future!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction on phase 1 at The Yorkdale Condominiums continues to progress as the 11th floor is currently being poured.\u00a0 Roof topping is estimated for later in November with the commencement of window installation by the end of the year. Above is a view looking east from Flemington Road.\u00a0 At the base are the two storey [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4050,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4049"}],"collection":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/comments?post=4049"}],"version-history":[{"count":3,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4049\/revisions"}],"predecessor-version":[{"id":4059,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4049\/revisions\/4059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/media\/4050"}],"wp:attachment":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/media?parent=4049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/categories?post=4049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/tags?post=4049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}