{"id":4123,"date":"2018-03-28T10:17:49","date_gmt":"2018-03-28T14:17:49","guid":{"rendered":"https:\/\/www.context.ca\/blog\/?p=4123"},"modified":"2018-03-28T10:17:49","modified_gmt":"2018-03-28T14:17:49","slug":"the-yorkdale-condominiums-construction-update-2","status":"publish","type":"post","link":"https:\/\/www.context.ca\/blog\/2018\/03\/28\/the-yorkdale-condominiums-construction-update-2\/","title":{"rendered":"The Yorkdale Condominiums Construction Update"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4124\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/1-644x1024.jpg\" alt=\"1\" width=\"644\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/1-644x1024.jpg 644w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/1-189x300.jpg 189w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/1-768x1221.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/1.jpg 1862w\" sizes=\"(max-width: 644px) 100vw, 644px\" \/><\/p>\n<p>Construction on the first phase of The Yorkdale Condominiums continues to progress with occupancy scheduled for Fall 2018!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4125\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/2-1-1024x512.jpg\" alt=\"2\" width=\"1000\" height=\"500\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/2-1-1024x512.jpg 1024w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/2-1-300x150.jpg 300w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/2-1-768x384.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>The exteriors of the two storey suites at grade are shown above.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4126\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/3-512x1024.jpg\" alt=\"3\" width=\"512\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/3-512x1024.jpg 512w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/3-150x300.jpg 150w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/3-768x1536.jpg 768w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/p>\n<p>Precast concrete at the base of the building (black) and on the facades of the tower (white) is complete.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4131\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/4-2-512x1024.jpg\" alt=\"4\" width=\"512\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/4-2-512x1024.jpg 512w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/4-2-150x300.jpg 150w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/4-2-768x1536.jpg 768w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/p>\n<p>Town facade and balcony details shown above.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4128\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/5-1-512x1024.jpg\" alt=\"5\" width=\"512\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/5-1-512x1024.jpg 512w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/5-1-150x300.jpg 150w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/5-1-768x1536.jpg 768w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/p>\n<p>Framing continues inside.\u00a0 A typical corridor is shown boarded and awaiting painting.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4129\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/6-1024x512.jpg\" alt=\"6\" width=\"1000\" height=\"500\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/6-1024x512.jpg 1024w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/6-300x150.jpg 300w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/6-768x384.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>The lobby may not look like much now, but soon it will be transformed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-4130\" src=\"http:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/7-768x1024.jpg\" alt=\"7\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/7-768x1024.jpg 768w, https:\/\/www.context.ca\/blog\/wp-content\/uploads\/2018\/03\/7-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>A view looking south towards downtown from the 15th floor balcony.\u00a0 Stay tuned for more updates as construction progresses!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction on the first phase of The Yorkdale Condominiums continues to progress with occupancy scheduled for Fall 2018! The exteriors of the two storey suites at grade are shown above. Precast concrete at the base of the building (black) and on the facades of the tower (white) is complete. Town facade and balcony details shown [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4124,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4123"}],"collection":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/comments?post=4123"}],"version-history":[{"count":1,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4123\/revisions"}],"predecessor-version":[{"id":4132,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/posts\/4123\/revisions\/4132"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/media\/4124"}],"wp:attachment":[{"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/media?parent=4123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/categories?post=4123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.context.ca\/blog\/wp-json\/wp\/v2\/tags?post=4123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}