Progress continues to be made at Queen & Ashbridge! After a long winter of excavation, ground floor formwork is primarily complete and formwork on the 2nd floor is about 50% complete.

Floor Pouring and Column Forming Using Concrete, Forms and Rebar

We are happy to report that Toronto Hydro has mobilized for our temporary site power which means that the site generators will soon be removed once power is connected to the site.

View of Entire Site from Immediately Overhead
View of the Site Looking North

View of the Site Looking West

There will continue to be a large volume of concrete and rebar deliveries to the site as structure progresses and the primary activity on site from now through the summer will be formwork as the structure takes shape.

Column Rebar in the Foreground with Formed Columns and Formwork in the Background
View of the Site Looking East

It may not look like much right now but above is a sneak peak from inside the condo elevator lobby and ground floor corridor. Stay tuned for more updates as Queen & Ashbridge continues to take shape!